Yes, before initiating Auto Calibration make sure the following requirements have been met:
• Verify the system has been started using the COLD or HOT startup procedure described in the Getting Started section and warmed up.
• Verify that two helium-free test parts have been installed.
• Verify that the calibrated leak standard is properly installed on the chamber and the 10% fall off date has not passed.